The Design of Work Systems in Several Different Manufacturing Industries

Authors

  • Imron Rosyadi NR Program Studi Teknik Industri, Fakultas Teknik, Universitas Madura, Indonesia Author
  • Dini Safitri Program Studi Teknik Industri, Fakultas Teknik, Universitas Madura, Indonesia Author

Keywords:

Manufactur, workproductivity, work system

Abstract

The production process should be viewed as a process of continuous improvement, which takes the form of a cycle that begins with the conception of the idea to manufacture a product, continues through product development, the production process, and finally ends with distribution to the end user. A set of businesses primarily engaged in producing and processing raw materials or semi-finished items into finished or ready-to-use products is referred to as the manufacturing industry. This study's objective is to determine the presentation of the rise in work productivity that occurs when there is work system design, as well as to find out what kinds of improvements are helpful for the design of the work system in a variety of manufacturing businesses

References

A natural classification system for social work literature and knowledge. (1981, March). Social Work. https://doi.org/10.1093/sw/26.2.134.

Ananda, S. D., Putri, D. D., & Shaniya, G. (2023, May 31). Manajemen Produksi Film Pendek Piknik Panik di Era Covid 19 Dari Pra Produksi, Produksi dan Pasca Produksi. Jurnal Audiens, 4(2), 289–300. https://doi.org/10.18196/jas.v4i2.29

Arifin, M., & Helmi, F. (2023, July 10). Sistem Informasi Manajemen Pelatihan Kerja Pada UPT Pelatihan Kerja Situbondo Berbasis Web. JUSTIFY : Jurnal Sistem Informasi Ibrahimy, 2(1), 30–37. https://doi.org/10.35316/justify.v2i1.3247

Dharmayanti, I., Hardjomidjojo, H., Miftah Fauzi, A., & Mulyadi, D. (2017, December). Model Optimasi Kapasitas Industri Pada Klaster Industri Hilir Kelapa Sawit Di Kawasan Industri Sei Mangkei. Jurnal Teknologi Industri Pertanian, 27(3), 242–252. https://doi.org/10.24961/j.tek.ind.pert.2017.27.3.242

-, E. (2022, December 20). Kajian Penerapan Metode Six Sigma sebagai Alat Peningkatan Kualitas Proses Manufaktur dan Produk di Industri Manufaktur Pulp dan Kertas. JURNAL VOKASI TEKNOLOGI INDUSTRI (JVTI), 4(2), 30–41. https://doi.org/10.36870/jvti.v4i2.294

Gultom, P., & Tamara, P. (2022, October 1). ANALISIS TEKNOLOGI DALAM INDUSTRI KECIL KERAJINAN GERABAH. Industri Inovatif : Jurnal Teknik Industri, 12(2), 127–133. https://doi.org/10.36040/industri.v12i2.4553

H. Yunita, “Sistem Pendukung Keputusan Untuk Seleksi Penerimaan Asisten Laboratorium Menggunakan Metode AHP,” Respati, vol. 14, no. 1, pp. 72–77, 2019, doi: 10.35842/jtir.v14i1.275.

Hadiani, D., Permata, N. N., & Ariyani, E. D. (2023, May 29). Vocational Students’ Perception toward the Use of Online Instructional Media. Soshum: Jurnal Sosial Dan Humaniora, 13(1), 63–75. https://doi.org/10.31940/soshum.v13i1.63-75

Khaerul Saleh, F. R. D. (2013, June 10). TEKHNIK-TEKHNIK PENCAHAYAAN PADA OBYEK JERUK UNTUK MENGHASILKAN KARYA FOTOGRAFI. Gorga : Jurnal Seni Rupa, 2(1). https://doi.org/10.24114/gr.v2i1.1032

Laili, M. H., & Damayanti, A. (2018, December 1). Kesenjangan Upah Antargender di Indonesia: Bukti Empiris di Sektor Manufaktur. Jurnal Ekonomi Dan Pembangunan Indonesia, 1–21. https://doi.org/10.21002/jepi.v0i0.1096

Madyan, M. (2019, May 20). DETERMINAN SIKLUS KONVERSI KAS INDUSTRI MANUFAKTUR DI INDONESIA (STUDI PADA PERUSAHAAN MANUFAKTUR YANG TERDAFTAR DI BURSA EFEK INDONESIA). Ekonomi Bisnis, 24(1), 50. https://doi.org/10.17977/um042v24i1p50-55

Mujiono, M., Junita S., E., & Sujianto, S. (2019, December 20). OPTIMALISASI BIAYA TRANSPORTASI PADA INDUSTRI MANUFAKTUR. Industri Inovatif : Jurnal Teknik Industri, 9(2), 27–30. https://doi.org/10.36040/industri.v9i2.363

N. A. Sutisna, “Perancangan Awal Sistem Mekanis dan Kontrol Mesin Hibrida Aditif dan Subtraktif Berbasis Arduino,” Semin. Nas. – XVIII Rekayasa dan Apl. Tek. Mesin di Ind., vol. 12, no. 12, pp. 1–11, 2019

Nurif, M. (2009, November 2). HUBUNGAN TIMBAL BALIK ANTARA STRATEGI MANUFAKTUR DAN BUDAYA ORGANISASI PADA INDUSTRI MANUFAKTUR. Jurnal Sosial Humaniora, 2(2). https://doi.org/10.12962/j24433527.v2i2.656

Nurul Shadrina, A., Raniah Zaim, S., & Arimurti, F. (2023, May 31). Manajemen Produksi Film Pendek Keling: Dari Pra Produksi, Produksi dan Pasca Produksi. Jurnal Audiens, 4(2), 320–330. https://doi.org/10.18196/jas.v4i2.36

Pardede, E., Novarika, W., & Sibuea, S. R. (2022, December 22). Analisis Pendapatan Industri Tahu di kelurahan Tanjung Gusta. Factory Jurnal Industri, Manajemen Dan Rekayasa Sistem Industri, 1(2), 59–66. https://doi.org/10.56211/factory.v1i2.175

Pratama, A., & Nurfadila, S. (2022, December 15). Implementasi Strategi Operasi Manufaktur Hijau Menuju Keberlanjutan Manufaktur. Jurnal Ekonomia, 12(2), 31–39. https://doi.org/10.54342/itbis-e.v12i2.253

Puryani, P., Berlianty, I., & Purwanto, P. (2018, June 1). PERANCANGAN SISTEM KERJA UNTUK MENINGKATKAN PRODUKTIVITAS DENGAN PENDEKATAN SISTEM SOSIOTEKNIK. OPSI, 11(1), 94. https://doi.org/10.31315/opsi.v11i1.2336

R. A. Ramdhani and A. N. Supena, “Perancangan Sistem Informasi Manajemen Persediaan Bahan Baku CV. X,” J. Ris. Tek. Ind., pp. 83–90, 2022, doi: 10.29313/jrti.v2i1.961.

Refiadi, G. (2016, April 29). METODA WITNESSING UNTUK PENENTUAN KONSTANTA PROSES CNC TURNING PADA MANUFAKTUR KOMPONEN AEROSPACE. Jurnal Konversi Energi Dan Manufaktur, 3(2), 89–98. https://doi.org/10.21009/jkem.3.2.6

S. Aji Pradana, M. T. Hasan, and N. Handayani, “Perancangan Sistem Penjadwalan Produksi Kaos Sablon Dengan Metode Earliest Due Date Pada Usaha Konveksi Nolabel Langsa,” 2020

S. K. Samal, “Logistics and supply chain management,” Int. J. Psychosoc. Rehabil., vol. 23, no. 6, pp. 361–366, 2019, doi: 10.37200/IJPR/V23I6/PR19077 9

Setiawan, H. (2021, March 22). Desain RPS Mata Kuliah Perancangan Sistem Kerja& Ergonomi Berbasis Nilai-Nilai Dasar CHAMPION. SAINTEK : Jurnal Ilmiah Sains Dan Teknologi Industri, 2(2), 56–74. https://doi.org/10.32524/saintek.v2i2.135

T. Yulianti, S. Samsugi, A. Nugroho, and H. Anggono, “Rancang Bangun Alat Pengusir Hama Babi Menggunakan Arduino Dengan Sensor Gerak,” Jtst, vol. 02, no. 01, pp. 21–27, 2021.

Tambusai, R. M. (2020, October 5). Efek Model Pembelajaran Problem Based Learning Dalam Meningkatkan Kemampuan Berfikir Kritis dan Hasil Belajar Mahasiswa Tekhnik Industri Universitas Potensi Utama. JURNAL IKATAN ALUMNI FISIKA, 6(3), 9. https://doi.org/10.24114/jiaf.v6i3.19343

Windarti, E., Sasongko, N., & Zulfikar, Z. (2017, April 14). ANALISIS PERBEDAAN KUALITAS ACCRUAL ANTARA SEBELUM DAN SESUDAH PENGADOPSIAN INTERNATIONAL FINANCIAL REPORTING STANDARD (IFRS) PADA PERUSAHAAN MANUFAKTUR DI INDONESIA(Studi Empiris pada Perusahaan Manufaktur yang terdapat di Bursa Efek Indonesia Tahun 2009-2014). Riset Akuntansi Dan Keuangan Indonesia, 2(1), 42–48. https://doi.org/10.23917/reaksi.v2i1.3652

Wiguna, I. P. A. A., & Purbadharmaja, I. B. P. (2019, July 30). PENGARUH KEMAMPUAN PRODUKSI, LUAS LAHAN DAN BIAYA PRODUKSI TERHADAP JUMLAH PRODUKSI SERTA PENDAPATAN PETANI PISANG. Buletin Studi Ekonomi, 101. https://doi.org/10.24843/bse.2019.v24.i01.p07

Y. Andrian and A. Kurnianto, “Perancangan Meja Kerja Yang Ergonomis Untuk Membantu Proses Repair Stripping Mirrors Dengan Metode Rula,” Proc. 2013 2nd Int. Conf. Meas. Inf. Control. ICMIC 2013, vol. 1, no. 26, pp. 509–512, 2021.

Zetli, S. (2019, May 30). HUBUNGAN BEBAN KERJA MENTAL DAN STRES KERJA PADA TENAGA KEPENDIDIKAN DI KOTA BATAM. JURNAL REKAYASA SISTEM INDUSTRI, 4(2), 63–70. https://doi.org/10.33884/jrsi.v4i2.1061

Downloads

Published

24.01.2024